McGrath Beach, California A crude oil pipeline leak resulted in an oil spill which impacted an irrigation pond, adjacent wetlands and a 14-inch in diameter, half-mile long runoff control pipeline which carried the crude oil to the ocean. The responsible party and its prime response contractor used PES-51™ for all response equipment decontamination (including OSRV hulls,...
The PES-51™ process can shorten the cleaning time by approximately 2 to 3 days. In addition to the cost savings, there is a safety benefit with less exposure for personnel injury.